WBS - Project Work Breakdown Brazil L 4+
Cost Budget Forecast Estimate
皓 李
Designed for iPad
-
- R$ 49,90
iPad Screenshots
Description
Manage the work breakdown structure (WBS) in the list and tree diagram. Construct the work package tree and update the estimate; import work items from MS Excel and export the work breakdown structure to PDF, Excel, and image files. Also, we can convert a work breakdown structure to a project plan file in the QuickPlan app.
The WBS is a hierarchical and incremental decomposition of the project into phases, deliverables, and work packages. It is a tree structure that shows a breakdown of the effort required to achieve a goal, such as a program, a project, and a contract.
Mobilinked WBS is THE easy-to-use WBS management app for the iPad. Using natural gestures on a clean interface makes WBS management more convenient, faster, and more efficient than ever before. Visualize and simplify the work breakdown structure in the outline and diagram view to break down work elements and determine labor, material, and total costs for each component. The app automatically adds costs up to the element hierarchy, and supports continuous and mass tracking.
The WBS can be exported to image, Excel, and PDF files AND converted to QuickPlan (https://itunes.apple.com/app/id621375878) as a project plan.
The WBS supports mass entry of work items and import of work items from an MS Excel file.
- Feature video - https://youtu.be/FZ7puht7Nao
- Support - at http://wbs.mbl.app
WBS provides a fast, intuitive and discoverable experience for users in a clean and elegant interface
- Work package maintenance - natural gestures, continuous and batch input in outline and diagram views.
- Project costing - support labor and material costs for work packages Communication - export the work breakdown structure as an image/PDF and Excel file.
- Collaboration - Share the work breakdown structure across multiple devices via email, airdrop, and third-party cloud apps.
- Project plan integration - Export to a project plan for QuickPlan.
FEATURES
- Manage work items in a text outline view and a graphical tree diagram view.
- Continuous and batch entry of work items.
- Import from MS Excel file
- Three chart layouts, AND Display as color or grayscale style.
- Color and icon
- Supports large projects (smooth interaction for 1000 task packages)
- Natural gestures (swipe left/right to adjust outline levels, tap with two fingers to collapse/expand all groups, hold and move to change order).
- Create project quotes with labor and material costs; labor costs can be entered as expenses.
- Adjust project fee rate, currency, and work package category.
- Collapse/expand specific or all groups; zoom in on a chart view.
- User interface customization options
- Share the work breakdown structure with other devices via email, airdrop, and third-party cloud apps.
- Export the outline with costs to a new project plan to QuickPlan (https://itunes.apple.com/app/id621375878).
- Export the entire work breakdown structure or a selected workgroup to an Excel file.
- Export the entire work breakdown structure or a selected workgroup to a PDF file with export customization options.
- Export the entire work breakdown structure or a selected workgroup to an image file.
- Undo and toast with voice output
- Duplicate work breakdown structure
Work breakdown structure makes work planning easy and fast, and helps estimate future project schedule by easily viewing work items and costs. The best project management app for your business on iPad.
What’s New
Version 6.5
Thank you for using WBS! This update contains minor bug fixes to improve your experience. We have fixed some minor issues reported by our users to ensure the app runs smoothly. As always, we value your feedback and are committed to providing you with the best experience possible.
Ratings and Reviews
Muito bom
Uso há cerca de 1 ano, desde 2017 para elaboração de projetos básicos e conceituais com estimativas iniciais de custos.
A integração com o QuickPlan é muito útil quando preciso melhorar as estimativas e preparar um cronograma básico.
Excelente
Muito bom o app. O único problema é o tamanho fixo dos itens da EAP.
Quebra o galho
É bom e Fácil de usar, mas não oferece múltiplas opções de seleção, o que é ruim para revisões do trabalho.
A exportação para Excel só se dá no formato de listas e a impressão tem poucas possibilidades de configuração.
Apesar destas limitações eu recomendo, principalmente pela relação custo x benefício.
App Privacy
The developer, 皓 李, indicated that the app’s privacy practices may include handling of data as described below. For more information, see the developer’s privacy policy.
Data Not Collected
The developer does not collect any data from this app.
Privacy practices may vary based on, for example, the features you use or your age. Learn More
Information
- Seller
- 皓 李
- Size
- 60.4 MB
- Category
- Business
- Compatibility
-
- iPad
- Requires iPadOS 12.0 or later.
- Mac
- Requires macOS 11.0 or later and a Mac with Apple M1 chip or later.
- Languages
- Age Rating
- 4+
- Copyright
- © 2015 ~ 2023 SwiftApps Inc.
- Price
- R$ 49,90
Supports
-
Family Sharing
Up to six family members can use this app with Family Sharing enabled.