Construction Change Order App 4+
Snappii
Diseñado para iPad
-
- Gratis
- Ofrece compras dentro de la app
Capturas de pantalla
Descripción
14-day free trial.
Construction Change Order App was specifically designed for employees working in the construction industry to create quick construction change order requests and provide them to selected supervisors for reviews. The app allows users to instantly fill in specific details including information about labor, equipment, parts, construction sites, date and timestamps, upload PDF documents, take pictures, perform specific calculations etc. The app can be 100% customized by Snappii.
With the help of the Construction Change Order App workers can create change orders on the spots, make a list of supervisors, assign orders to them, track supervisor's feedback and proposed changes in case of rejections. Employees can easily track if their order was accepted or denied and re-make orders on demand. Due to the in-built calculator it is simple to estimate total hours and costs needed to complete a particular project. That definitely saves time and expenses as well as improves accuracy and eliminates paperwork.
Any order will be securely stored on user's device and can be emailed, uploaded to cloud drives or printed out as a PDF form. Moreover, users can upload their own fillable PDF forms to collect specific information as an additional option. The uploaded files will be saved into the library of templates that can be re-used multiple times and shared.
Construction Change Order App will enable users to:
- make construction changes orders on the go
- work offline and online
- save collected orders on a device
- sync completed orders across multiple devices
- track order statuses
- remake orders on demand
- make specific calculations
- share PDF files
- add supervisors
- make reviews and comment on them
- upload custom PDF forms
- custom search by orders
By downloading, you agree to the Terms of Use at https://www.snappii.com/terms-of-service and privacy policy at https://www.snappii.com/policy
After the free trial, you can get unlimited number of form submissions by subscribing via an optional In-App Purchase. Subscribe from your device and access these services via mobile app.
Novedades
Versión 1.0.21
In this version, we have improved app performance.
Send your feedback to support@snappii.com
Privacidad de la app
El desarrollador, Snappii, ha indicado que las prácticas de privacidad de la app pueden incluir la gestión de datos descrita a continuación. Para obtener más información, consulta la política de privacidad del desarrollador.
Datos no vinculados contigo
Los siguientes datos pueden recopilarse, pero no se vinculan con tu identidad:
- Datos de contacto
Las prácticas de privacidad pueden variar, por ejemplo, dependiendo de tu edad o de las funciones que uses. Más información
Información
- Proveedor
-
Snappii Corporation se ha identificado como comerciante de esta app y ha confirmado que este producto o servicio cumple la legislación de la Unión Europea.
- Número DUNS
- 078694552
- Dirección
- 380 Lafayette rd Unit 11-301 Seabrook New Hampshire 038743 Estados Unidos
- Número de teléfono
- +1 6035020191
- Correo electrónico
- bev@snappii.com
- Tamaño
- 46,7 MB
- Categoría
- Economía y empresa
- Compatibilidad
-
- iPhone
- Requiere iOS 12.0 o posterior.
- iPad
- Requiere iPadOS 12.0 o posterior.
- iPod touch
- Requiere iOS 12.0 o posterior.
- Mac
- Requiere macOS 11.0 o posterior y un Mac con el chip M1 de Apple o posterior.
- Apple Vision
- Requiere visionOS 1.0 o posterior.
- Idiomas
-
Inglés
- Edad
- 4+
- Copyright
- © 2024 Snappii
- Precio
- Gratis
- Compras dentro de la app
-
- Annual Subscription 139,99 €
- Monthly Subscription 14,49 €
- Ad removal 0,99 €