Get the free version of inShort for iOS! Click "inShort Support" to learn more about the offer.

This program allows you to build diagrams of processes and monitor their execution. As a rule, tasks do not exist on their own, they are usually interrelated, and the best way to show this is to build a diagram of processes.

Almost every task in the program can be drilled down to a separate diagram, until the project is broken down into elementary operations. Having constructed a detailed scheme, you can simulate the future execution of the project, what will become the basis for the planned schedule, which can be compared with the current execution of tasks without leaving the program. You can also place some tasks in the Calendar and set reminders on them.

More formally, the program allows you to build a customized, based on the BPMN notation, PERT diagram of the project (with events and processes at nodes). Then this description of the project is used to generate a Gantt chart and track the progress of the project.

***
inShort Pro — application version for experienced and advanced users, contains advanced and service functions useful for in-depth work with diagrams.
Functions included in inShort Pro:
• Working with layers of diagrams;
• inReview: publications of user diagrams surveys by experienced project managers, indicating successful findings and weaknesses in the diagrams.

The inShort Pro version is available by monthly subscription. Subscription automatically renews unless auto-renew is turned off at least 24 hours before the end of the current period.
inShort Pro Subscription Terms of Use link: http://www.shortki.com/inShort/proTerms.html
***

So, inShort is a powerful tool to work with projects and business processes, which can be applied not only in office but also for personal purposes. You can further explore the capabilities of the program with the detailed interactive User Guide.

Here are a few cases in which this program can help you:

You have a difficult task, you do not know where to start and how to approach it.
Try to approach it with this program and you'll find out where to start and where to move.

You suspect that business processes in your organization are not optimal and you are doing a lot of unnecessary work?
Build a scheme of processes in this program, and you'll see what's what.

Key features:
• Building the diagram of processes and resources (PERT network diagram of the project, based on BPMN notation).
• Drill down the diagram elements.
• Tracking the execution of processes.
• Advanced mode of pre-planning.
• Integration with the standard Calendar.
• Displaying the list of tasks in the form of a Gantt chart.
• Separation of physical and information flows.
• Export of diagrams into PDF files and OPML outlines.
• Ability to specify the expected time of execution, both directly and parametrically.
• Working calendars taking into account various schedules of work for implementation of tasks.
• Work resources and their assignment to tasks.
• Material resources, counting the usage of resources by the diagram.
• Localization of work and resources in places.
• Queues of tasks: organize the work with active tasks in accordance with the elements of the GTD methodology.
• Control lists for diagrams — monitor the sequence of actions with the diagram step by step.

Advanced features of project management in accordance with the Theory of Constraints technique:
• finding the critical path;
• positioning of time buffers of the project;
• calculation of buffer sizes;
• calculation of late starts for feeding paths of the project;
• tracking of time indicators during project execution.

Cannot solve a problem? Draw it inShort and sort things out with it there. It's like voodoo but it works.

新機能

バージョン 3.4

Improved quick edit control:
• now by default the object type is duplicated;
• added hot keys for selecting the mode for creating a new object;
• added a feature of quick comment on the Shift key.

Increased application stability and improved compatibility with the new versions of macOS, in particular:
• restored support for Touch Bar;
• adjustments were made in the calculation of working time in the presence of special non-working periods in the calendars;
• fixed artefacts when drawing a Gantt chart.

We are grateful to all users who leave a review on the application, they are a great motivation for the further development of inShort.

評価とレビュー

4.3/5
3件の評価

3件の評価

T00t00T00

BPMN表記法を理解していれば使いやすい。

BPMN表記法を軽くでも知っていれば使いやすいプロジェクト管理が出来る。
一人でプロジェクト前にシュミレーションしたりするにはグラフィカルでテキストでタスクを細かく書いていくアプリより優れていると思う。
実際にプロジェクトをチームで運営するに当たっては、チーム間で共有出来る様になったら最高だと思う。

inarin

体験版はWebで

かなり高いが買う価値はあるアプリ。workflow.link というサイトに登録すればアプリとほぼ同じ動作が30日間の無料期間で体験できる。

ちょうこつ

これは単なる作図アプリではなく素晴らしい進行作成/管理アプリだ

シンプルでキュートなフロー図+Ganttを書けるツール程度の認識で導入してみたが、まずはチュートリアルを見てびっくり。
各オブジェクトにアクションを設定できて、まるでこれだけでちょっとしたゲームができそうなくらいの機能があって、フローを作成したら専用の進行管理アプリができたよう。

まだ導入したばかりで色々使いこなせていないが、例えばプロセスから次のオブジェクトを作成した際のデフォルトがリソース、リソースからはプロセスとなっていたりで、とても良く分かっている事を感じる。
このアプリが提供するフレームワークをうまく利用することでプロジェクト管理がより上達できそうな気にさせてくれる。

日本語も入力する分には問題なし。
素晴らしいツールなので是非グループでの進捗管理に使いたいのだが、インターフェースがMac/iOS Appしかないのがちょっと問題。
WindowsやAndroidユーザーもいるのでExecutionモードはWebインターフェースも用意される事を期待する。

情報

販売元
Iouri Korotkikh
サイズ
13.5MB
カテゴリ
仕事効率化
互換性

OS X 10.9 以降、64ビットプロセッサ

言語

ロシア語、英語

年齢
4+ 対象年齢
Copyright
© 2016 Jury Shortki. All rights reserved.
価格
¥4,700

サポート

  • ファミリー共有

    ファミリー共有を有効にすると、最大6人のファミリーメンバーがこのAppを使用できます。

このデベロッパのその他のApp