UK Trains - Performance (PPM) 4+
UK Passenger Train network
Jonathan Gibbs
-
- Free
- Offers In-App Purchases
Screenshots
Description
The public performance measure (PPM) measures the performance of individual trains advertised as passenger services against their planned timetable as agreed between the operator and Network Rail at 22:00 the night before. PPM is therefore the percentage of trains 'on time' compared to the total number of trains planned.
A train is defined as on time if it arrives at the destination within five minutes (ie 4 minutes 59 seconds or less) of the planned arrival time for London and South East or regional services, or 10 minutes (ie 9 minutes 59 seconds or less) for long distance services.
Where a train fails to run its entire planned route calling at all timetabled stations it will count as a PPM failure.
What’s New
Version 6.02
Data feed updates
App Privacy
The developer, Jonathan Gibbs, indicated that the app’s privacy practices may include handling of data as described below. For more information, see the developer’s privacy policy.
Data Used to Track You
The following data may be used to track you across apps and websites owned by other companies:
- Identifiers
Data Linked to You
The following data may be collected and linked to your identity:
- Identifiers
Privacy practices may vary based on, for example, the features you use or your age. Learn More
Information
- Seller
- Jonathan Gibbs
- Size
- 20.2 MB
- Category
- Travel
- Compatibility
-
- iPhone
- Requires iOS 12.0 or later.
- iPad
- Requires iPadOS 12.0 or later.
- iPod touch
- Requires iOS 12.0 or later.
- Apple Vision
- Requires visionOS 1.0 or later.
- Languages
-
English
- Age Rating
- 4+
- Copyright
- Copyright © 1995-2023 JG Services. All Rights Reserved.
- Price
- Free
- In-App Purchases
-
- No Ads S/ 7.90