
Extracker - T&M Tracking 4+
Construction Time and Material
Extracker LLC
Designed for iPad
-
- Free
Screenshots
Description
Create professional Time and Material Tags in Seconds.
You're a builder, not a paper pusher. Extracker makes creating professional looking Time and Material Tags ridiculously easy. Use our free mobile app to document labor, material and equipment spent on Extra work, collect customer signatures right on the mobile device and have a clean PDF logged with both your home office and customer in seconds.
KEY FEATURES:
- View all project Change Orders and Time and Material Tags on the go at any time
- Create Time and Material Tags
- Photo document your work with time-stamped pictures
- Preset labor, material, equipment and other rates so they can be selected from a drop down
- Create a copy of an already created T&M Tag. (Eliminate data entry forever!)
- Have your customer sign directly on the device or submit a request for signature via email.
- Preview the unsigned PDF for your customer's review prior to signature
- Email the signed copy to anyone directly from the app
“Extracker is a game-changer for us. Our customers are happier, we are getting paid faster and my team has fewer headaches. We now have the tools to not only professionally document and communicate all of our out of contract work, but also speed up the processing time getting it to our customers.”
-Andy Miller, Senior Account Manager, Service By Medallion
“Our paper T&M tag process often led to a bottom-line loss of profit due to the lack of visibility, length of time to receive from the field, and lack of ability to adequately describe the change order. Using Extracker to document field directed Extra Work has added money directly to our bottom line. With the streamlined use of Extracker, our field foreman can now quickly create, photo document and, track T&M tags electronically helping our Project Managers in the office instantly and accurately transmit a complete COR to our GC clients."
-Ryan Wall, Partner, Silicon Valley Mechanical
In commercial construction when extra work is performed out on the jobsite it is universally tracked on a Time and Material document to verify the amount of labor, material and equipment used are accurate. At Extracker, we call this document a Time and Material Tag but many companies have different names for this same document such as:
Time and Material Ticket
Time and Material Slip
T&M Ticket
T&M Slip
T&M Tag
Extra Work Order (EWO)
Extra Work Authorization (EWA)
Extra Work Report (EWR)
Service Order
Field Work Authorization (FWA)
Daily Extra Work Report (DEWR)
Day Work Report (DWR)
Work Order
Field Work Order (FWO)
Order for Additional Work
Additional Work Authorization Field Report
Time and Material Extra Work
Force Account Report (FAR)
Survey Service Record (SSR)
Please schedule a call with us if you want help setting up the app or getting your team trained!
What’s New
Version 4.0.13
• Minor bug fixes and improvements.
Ratings and Reviews
Best Change order program - Takes some time to setup
It is a phenomenal program but you have to take a week so set up all of your lists. Pays for itself quickly. Greg is a wizard and they continue to make it easier and faster and do more all of the time. I track over $60m in projects and it gives me a complete pic from my 10 pms. I spent the time to train staff and teach it to make it work. It would be great to allow an import lookup from Home Depot and RS Means but still amazing.
Easy app to streamline extra work orders
Great app, field guys no longer need to worry about keeping track of paper tags and getting them back to the office. My customers also love the straight forward templates and easy notifications. Highly recommend
Amazing App
Great app for simplification if change order management
App Privacy
The developer, Extracker LLC, indicated that the app’s privacy practices may include handling of data as described below. For more information, see the developer’s privacy policy.
Data Linked to You
The following data may be collected and linked to your identity:
- Contact Info
- User Content
- Identifiers
Privacy practices may vary, for example, based on the features you use or your age. Learn More
Information
- Seller
- Extracker LLC
- Size
- 28 MB
- Category
- Business
- Compatibility
-
- iPhone
- Requires iOS 10.0 or later.
- iPad
- Requires iPadOS 10.0 or later.
- iPod touch
- Requires iOS 10.0 or later.
- Mac
- Requires macOS 11.0 or later and a Mac with Apple M1 chip.
- Languages
-
English
- Age Rating
- 4+
- Copyright
- © 2019 Extracker LLC
- Price
- Free