SiteTicket: Change Order App
T&M tickets. Signed on site.
Free · In‑App Purchases · Designed for iPad. Not verified for macOS.
Customer said "go ahead" by text? SiteTicket turns that reply into an approval record — attached to the ticket, printed on the PDF, ready for invoice day.
You did the extra work. The customer said "go ahead." Then the invoice lands and suddenly nobody remembers saying that.
SiteTicket turns the rough note you'd scribble on site into a clean change order: what changed, why it costs more, the labor and material lines, the photos, and the customer's signature. Two minutes, before you pick your tools back up.
HOW IT WORKS
Write the site note the way you'd actually say it. "Move three outlets higher, cabinets went in first, verbal OK from owner."
Let AI draft it into clear scope and approval wording. Your facts stay your facts: quantities, times, and boundaries are preserved, and it never invents prices or legal terms.
Add cost lines and job photos.
Get the signature, then share a PDF, text the customer a summary, or paste a note into your invoicing app.
WHAT YOU GET
Change orders and T&M tickets from one rough note
Labor and material line items
Job photos attached as evidence
On-site signature capture, or a record of the verbal approval
Written reply approvals: attach up to 3 screenshots of the customer's text or email, printed on the PDF beside the approval record
Clean customer PDF
Copy-ready text for customer messages and invoice notes
Ticket history on your phone
WORKS WITH WHAT YOU ALREADY USE
SiteTicket is not another system to run your business from. Keep your invoicing app, your spreadsheet, your texts. SiteTicket handles the moment those tools miss: getting the change approved in writing while you're still standing in front of the customer.
WHO IT'S FOR
Electricians, plumbers, remodelers, handymen, painters, roofers, property maintenance. Anyone who hears "while you're here, could you also..." every week.
FREE TO START
Tickets, signatures, and PDFs are free with no limit. You get 3 AI drafts every month for free. If extra work shows up more often than that, subscriptions unlock 25 to 300 AI drafts a month. Apple shows the exact price before you buy, and you can cancel anytime.
Questions or a feature you need? Email qinze5577@gmail.com. It's a small operation, so you'll get an answer from the person who builds the app.
Terms of Use: https://www.apple.com/legal/internet-services/itunes/dev/stdeula/
Privacy Policy: https://ryooma.com/siteticket/privacy-policy
Ratings & Reviews
Customer approved by text? That reply now lives on the ticket.
• New approval method: Written reply — for customers who approve by text or email
• Attach up to 3 screenshots of the customer's reply; they print on the PDF right next to the approval record
• The same approval line appears in the copy-ready text, so your invoice note and your PDF always match
• Typing numbers is more reliable, and the number keyboard now has a Done button
• Name and address fields no longer fight autocorrect
Tickets, signatures, and PDFs stay free. AI drafting includes 3 free runs a month.
The developer, Haicheng Maoyu Network Technology Co., Ltd., indicated that the app’s privacy practices may include handling of data as described below. For more information, see the developer’s privacy policy .
Data Linked to You
The following data may be collected and linked to your identity:
- Purchases
- Contact Info
- User Content
- Identifiers
- Usage Data
Accessibility
The developer has not yet indicated which accessibility features this app supports. Learn More
Information
- Seller
- Haicheng Maoyu Network Technology Co., Ltd.
- Size
- 19.8 MB
- Category
- Business
- Compatibility
Requires iOS 17.0 or later.
- iPhone
Requires iOS 17.0 or later. - iPad
Requires iPadOS 17.0 or later. - Mac
Requires macOS 14.0 or later and a Mac with Apple M1 chip or later. - Apple Vision
Requires visionOS 1.0 or later.
- iPhone
- Languages
- English
- Age Rating
4+
- 4+
- In-App Purchases
Yes
- Pro Annual $199.99
- Pro Monthly $19.99
- Plus $9.99
- Core $4.99
- Copyright
- © 2026 Zhenqi Ren
