Smart Arrow Project Manager
Project, Resource & Time Mgmt.
Free · In‑App Purchases
Integrated Project & Resource Management solution using CPM (Critical Path Method) and providing amazing Project Costs & Resources Projection Screens & Charts.
The Project & Resource Management features implement the following project planning & tracking workflow:
a) Project Planning - Create project providing its planning data: start date, duration, finish date, effort and cost.
b) Task Planning - Using CPM (Critical Path Method)
b.1) Tasks Without Predecessors - Add tasks providing their planning data: start date, duration, finish date, effort and cost.
b.2) Tasks With Predecessors - Add tasks providing their planning data: duration, predecessors, effort and cost. CPM calculates task planned start & finish dates.
b.3) All Tasks - CPM calculates task planning data: earliest start & finish dates, latest start & finish dates, and total & free floats.
c) Resource Planning Screen & Chart - Add project resources providing resource identification, category, availability, and cost details.
d) Resource Allocation - Allocate project resources to tasks providing allocated quantity, and allocated daily hours.
e) Resource Projections Screen & Chart - Evaluate resource and task level allocation values projected for weekly & monthly periods.
f) Project Cost Projections Screen & Chart - Evaluate project, resource category, and resource level costs projected for weekly & monthly periods.
g) Task Tracking - Track task execution providing actual start & end dates, actual effort & effort to complete, and actual cost & cost to complete.
h) Project Tracking - Analyze project execution data: actual start & end dates, actual effort & effort to complete, and actual cost & cost to complete.
h.1) The "Project Planning & Tracking" screen provides project & task effort & cost based progress indicators.
h.2) The "Project Gantt Chart" screen highlights project & task planning & tracking dates, progress, and delay risks.
The Time Tracking feature allows you to track the time spent on your project tasks
a) The Time Tracking Dashboard screen allows you to automatically track the time spent on your project tasks.
b) The Time Sheet Details screen allows you to manually track the time spent on your project tasks.
c) The Time Tracking Report & Chart provide the daily, weekly, and monthly total times spent on your projects & tasks.
d) The Task Timer screen allows you to automatically track the time spent on one particular project task.
e) The Task Time Split screen allows you to split one particular task time record into two records.
f) The Task Time Transfer screen allows you to transfer one particular task time record from the task to another.
The Project Billing Feature allows you to configure project & task billing settings, and create & export project billing reports.
a) The Project Billing Settings screen allows you to configure several project billing parameters such as regular time rate and daily & weekly overtime rates & limits.
b) The Project Planning & Tracking screen includes the "Billable" switch, which allows you to identify the project tasks that should be billed.
c) The Billing Report Details screen provides a multi-level billing report encompassing the following sections: Report Summary, Weekly Summary, Daily Summary, and Daily Details.
d) The Billing Report Export button allows you to export billing reports with different levels of granularity.
The To Do Lists feature allows you to create, maintain, and track Project & Task Level To Dos.
Smart Arrow Project Manager® supports iCloud connectivity, which ensures that all local database changes are uploaded to the iCloud database, and synchronized with your iPhone and iPad devices.
The Standard App provides the following features: Project Management using CPM (Critical Path Method), Time Tracking, and To Do Lists.
The "Premium" Subscription Plans provide the following features: Resource Management, Manual Time Sheets, and Project Billing.
The "Premium Plus" Subscription Plans provide the following features: Resource Management, Manual Time Sheets, Project Billing, Amazing Charts, and Family Sharing.
more Project Cost Projections Chart (Enhancements)
-----------------------------------------------
Added the "Cumulative" option, which allows you to visualize Project Cost Projections Charts with Cumulative Values.
This option is particularly helpful when you select the Area Chart or Bar Chart options, because they basically provide Multiple Stacked Project Cost S-Curves.
For example, when you choose the Category Level and Monthly Period options, you get Multiple Stacked Resource Category Level S-Curves showing Cumulative Monthly Values.
9.3 Mar 17
Resource Projections Chart (Enhancements)
--------------------------------------------
* Improved User Experience by executing the Resource Projections Data Preparation process under a background task.
* Improved User Feedback by presenting an Activity Indicator while the background task is running.
* Improved the Resource Projections Chart rendition by including periods where there is no resource utilization.
9.2 Mar 11
In-App Purchases Improvements
---------------------------------
Improved the processing of Requests for Access to Premium Features, ensuring that requests are granted when the appropriated Active Subscription Entitlement Record is available.
This process ensures that requests are properly and efficiently processed, even when there is no Internet Connection available, which prevents the continuous capture and processing of In-App Purchase Transaction and Subscription Update messages in real-time.
Export Projects Improvements
------------------------------
The following fields have been added to the Resource Allocation record:
* Allocated Daily Hours
* Available Daily Hours
9.1 Feb 24
In-App Purchase Changes
The "Smart Arrow PM Premium" Product has been replaced by the Premium & Premium Plus Subscription Plans.
> Current clients will retain full access up to Smart Arrow Project Manager Version 9.0 functionality.
> Current clients can also purchase subscription plans, in order to continue having full access to future Premium or Premium Plus Features.
The following Subscription Plans are now available:
> Premium - These plans provide the following features: Resource Management, Manual Time Sheets, and Project Billing. These plans also provide "One Month Free" Introductory Offer.
> Premium Plus - These plans provide the following features: Resource Management, Manual Time Sheets, Project Billing, Amazing Charts, and Family Sharing. These plans also provide "Two Months Free" Introductory Offer.
The "Support & Settings" screen now includes the "Premium Subscription Plans" option, which provides access to the following screens:
"Premium Product Purchase" screen
This screen is presented for clients that have already purchased the "Smart Arrow PM Premium" product.
This screen provides details about the product purchase transaction, and ensures the client retains full access up to Smart Arrow Project Manager Version 9.0 functionality.
"Subscription Plans" Screen
This screen provides details about the available subscription plans such as premium features, prices, billing cycles, and introductory offers.
This screen allows the client to purchase subscription plans by selecting the chosen subscription plan, and touching upon the "Subscribe" button.
This screen allows the client to change subscription plans by selecting the new chosen subscription plan, and touching upon the "Change Plan" button.
"Manage Subscriptions" Screen
The "Entitlements" tab provides information about the client's current entitlements.
> The "Current Plan" section provides details about the currently purchased or granted (via family sharing) subscription plan.
> The "New Plan" section provides details about the newly purchased or granted (via family sharing) subscription plan.
The "Entitlements" tab allows the client to take the following actions upon the currently purchased subscription plan:
> Cancel Subscription by selecting the subscription plan and touching upon the "Cancel Subscription" button.
> Request Refund by selecting the subscription plan and touching upon the "Request Refund" button.
The "Transactions" tab provides information about the client's full transaction history including: Purchases, Upgrades, Cancellations, Expirations, and Revocations.
"Restore Purchases" Screen
This screen allows the client to restore all purchases, entitlements, and associated transactions by touching upon the "Restore Purchase" button.
Request Review Process - New Functionality
The Request Review Process has been redesigned adopting Swift UI & Store Kit 2 technology.
The Request Review Screen is presented whenever the number of Data Entity Updates performed reaches a certain limit within a certain period of time.
Resource Tasks Screen - New Functionality
This screen includes the following additional columns:
> Allocated Daily Hours (HH:MM) - This column allows the user to provide the number of daily hours required when allocating the selected resource to one or more tasks. (A)
> Available Daily Hours (HH:MM) - This column shows the selected resource's available daily hours. (A)
Task Resources Screen - New Functionality
This screen includes the following additional columns:
> Allocated Daily Hours (HH:MM) - This column allows the user to provide the number of daily hours required when allocating one or more resources to the selected task. (A)
> Available Daily Hours (HH:MM) - This column shows the allocated resource's available daily hours. (A)
Notes:
(A) These columns apply to Work & Technology Resources only.
9.0 Jan 27
Project Cost Projections Screen (Enhancements)
-------------------------------------------------
a) Added "Chart" button - This button launches the Project Cost Projections Chart Screen.
Project Cost Projections Chart Screen (New)
--------------------------------------------
This screen provides Project Cost Projections Charts for the following options:
* Chart Type: Line Chart, Area Chart, and Bar Chart
* Projection Level: Category and Resource
* Projection Period: Weekly and Monthly
* Category Choice: All, Work, Technology, Material, Service, and Other
Projection Level Options
------------------------
* The "Category" option shows Cost Projections for All Resources consolidated at the Resource Category Level (i.e. Work, Material, Technology, Service, and Other).
* The "Resource" option shows Cost Projections for Top Five Resources consolidated at the Resource Level.
Category Choice Options
-------------------------
* The "All" Categories option shows Cost Projections for the Top Five Resources selected from All Resource Categories.
* The Specific Category options show Cost Projections for the Top Five Resources selected from the chosen Resource Category.
Note: The "Category Choice" options are presented when the "Resource" Project Level option is selected
Category / Resource Costs Breakdown Popup Screen
------------------------------------------------------
This screen is presented when the user selects a particular Week / Month by touching upon the Chart Area.
This screen shows the Category / Resource Names & Total Costs for the selected Week / Month.
The Categories / Resources are listed in descending order of Total Cost.
8.5 04/01/2025
This new version & build includes the following changes:
Project Planning & Tracking Screen (Enhancements)
-----------------------------------------------------
* Added "Project Cost Projections" option to the "Project Name" cell's Context Menu.
Note: The Context Menu shows up when you long press upon the "Project Name" cell.
Project Cost Projections Screen (New)
--------------------------------------
This screen provides Project, Resource Category, and Resource Level Cost Projections.
* The Project Level Cost Projections are presented in the top row.
* The Resource Category Level Cost Projections are listed right below the Project row.
* The Resource Level Cost Projections are listed right below each expanded Resource Category row.
This screen allows you to take the following actions:
* Choose the Project Cost Projection Period (Weekly or Monthly).
* Expand or Collapse the Resource Category rows.
* Sort the Project Cost Projections screen grid by touching upon the Column Headers.
8.4 02/25/2025
Time Tracking Chart (Enhancements)
-------------------------------------
Added "Line Chart", "Area Chart", and "Bar Chart" choices to the "Time Series Charts" option:
* The "Line Chart" shows Independent Lines depicting Time Tracking Values for the selected Aggregation Criteria & Aggregation Period.
* The "Area Chart" shows Stacked Zones depicting Time Tracking Values for the selected Aggregation Criteria & Aggregation Period.
* The "Bar Chart" shows Stacked Bars depicting Time Tracking Values for the selected Aggregation Criteria & Aggregation Period.
Notes:
* The Aggregation Criteria choices are Project, Task, and Date.
* The Aggregation Period choices are Daily, Weekly, and Monthly.
8.3 12/19/2024
Code Fixes & Improvements
----------------------------
Time Tracking Report
---------------------
Improved the Initial Time Tracking Chart Preparation Process by sending Compressed Time Tracking Lists to the Time Tracking Chart.
Time Tracking Chart
---------------------
Improved the Final Time Tracking Chart Preparation Process by creating Expanded Time Tracking Lists locally, which minimizes the Time Tracking Lists processing time.
8.2 12/13/2024
Version 8.1 includes the following code fixes:
---------------------------------------------
Date Interval Picker Screen
---------------------------
The "Preset Date Intervals" selection functionality has been fixed, in order to ensure the correct Date Interval Start & End Dates are established, when a particular Preset Date Interval is selected.
Version 8.0 provides a comprehensive suite of Time Tracking Charts & Lists encompassing:
-------------------------------------------------------------------------------------------
> Time Series Line Charts showing the total time spent on each Project & Task on a Daily, Weekly, and Monthly basis.
> Summary Bar Charts showing the total time spent on each Project & Task.
> Summary Lists showing the total time spent on a Daily, Weekly, and Monthly basis.
Time Tracking Report Screen - Enhancements
----------------------------------------------
Added "Chart" button to the screen header - This button triggers the following actions:
a) The "Date Interval Picker" screen is presented so you can select the Date Interval Start & End Dates.
b) After you confirm the Data Interval selection, the following steps are performed:
> Several Project & Task Time Tracking Lists are created.
> The "Time Tracking Chart" is presented.
Date Interval Picker Screen - New
----------------------------------
This screen allows you to select the Date Interval Start & End Dates.
You can either selected one of the Preset Date Intervals or provide specific Start & End Dates.
This screen confirms the actual number of Time Tracking Records retrieved, right after the Date Interval Start & End Dates are provided.
This screen returns control back to the Time Tracking Report screen when you touch upon the "Confirm" button.
Time Tracking Charts - New
----------------------------
Time Series Charts
-------------------
This option provides Line Charts for the following combinations:
> Aggregation Criteria: Project, Task, and Date
> Aggregation Periods: Daily, Weekly, and Monthly
The Project / Task option shows time series for the Top Five Projects / Tasks.
The Date option shows a single time series reflecting all selected time tracking records.
The Date Period and the Total Time are presented when you select a particular date period, by touching upon the chart area.
The Project / Task Total Time Breakdown popup screen is presented when you select a particular date period, and the Project / Task option has been selected.
Summary Charts / Lists
-----------------------
The Summary Charts are presented when the Project or Task option is selected.
> This chart shows all projects & tasks in descending order of their respective total times.
> The total time is presented when you touch upon a particular Project / Task bar.
The Summary Lists are presented when the Date option is selected.
> The summary lists are provided for Daily, Weekly, and Monthly periods.
Resource Costs Chart - Code Fixes
-----------------------------------
The chart sub-title has been fixed because it was not showing the correct project name.
8.1 11/07/2024
This version provides a comprehensive suite of Time Tracking Charts & Lists encompassing:
> Time Series Line Charts showing the total time spent on each Project & Task on a Daily, Weekly, and Monthly basis.
> Summary Bar Charts showing the total time spent on each Project & Task.
> Summary Lists showing the total time spent on a Daily, Weekly, and Monthly basis.
Time Tracking Report Screen - Enhancements
----------------------------------------------
Added "Chart" button to the screen header - This button triggers the following actions:
a) The "Date Interval Picker" screen is presented so you can select the Date Interval Start & End Dates.
b) After you confirm the Data Interval selection, the following steps are performed:
> Several Project & Task Time Tracking Lists are created.
> The "Time Tracking Chart" is presented.
Date Interval Picker Screen - New
----------------------------------
This screen allows you to select the Date Interval Start & End Dates.
You can either selected one of the Preset Date Intervals or provide specific Start & End Dates.
This screen confirms the actual number of Time Tracking Records retrieved, right after the Date Interval Start & End Dates are provided.
This screen returns control back to the Time Tracking Report screen when you touch upon the "Confirm" button.
Time Tracking Charts - New
----------------------------
Time Series Charts
-------------------
This option provides Line Charts for the following combinations:
> Aggregation Criteria: Project, Task, and Date
> Aggregation Periods: Daily, Weekly, and Monthly
The Project / Task option shows time series for the Top Five Projects / Tasks.
The Date option shows a single time series reflecting all selected time tracking records.
The Date Period and the Total Time are presented when you select a particular date period, by touching upon the chart area.
The Project / Task Total Time Breakdown popup screen is presented when you select a particular date period, and the Project / Task option has been selected.
Summary Charts / Lists
-----------------------
The Summary Charts are presented when the Project or Task option is selected.
> This chart shows all projects & tasks in descending order of their respective total times.
> The total time is presented when you touch upon a particular Project / Task bar.
The Summary Lists are presented when the Date option is selected.
> The summary lists are provided for Daily, Weekly, and Monthly periods.
Resource Costs Chart - Code Fixes
-----------------------------------
The chart sub-title has been fixed because it was not showing the correct project name.
8.0 10/29/2024
Resource Category Costs Pie Chart
-----------------------------------
This chart provides Resource Category Costs for the Selected Project.
The Chart Slices depict the Resource Category's Total Allocated Cost.
The Category Name and the Total Allocated Cost are presented when you touch upon the Chart Slices.
Notes:
(A) This chart is presented, at the top of the screen, when the "Pie Chart" option is selected.
Resource Category Costs Bar Chart
------------------------------------
This chart provides Resource Category Costs for the Selected Project.
The Chart Bars depict the Resource Category's Total Allocated Cost.
The Category Name and the Total Allocated Cost are presented when you touch upon the Chart Bars.
Notes:
(A) This chart is presented, at the top of the screen, when the "Bar Chart" option is selected.
Resource Costs Bar Chart
--------------------------
This chart provides Resource Cost Details for the Selected Resource Category.
The Chart Bars depict the Resource's Total Allocated Cost.
The Total Allocated Cost is presented when you touch upon the Chart Bars.
Notes:
(A) This chart is presented, at the bottom of the screen, reflecting the Resource Category that has been selected in the top chart.
Screen & iCloud Settings Screen "Enhancements"
--------------------------------------------------
Added "Chart Appearance" section with "User Interface Style" option, which allows you to have the Resource Planning Charts presented in either Light Mode or Dark Mode.
7.8 07/26/2024
Resource Projections Chart "New"
----------------------------------
This chart provides Resource Level Projections for the Selected Resource.
The Chart Bars depict the Projected Values, and the Threshold Line (A) depicts the Resource Limit, which is calculated based on the Resource's Available Quantity.
The Projected Period, Projected Value, and Resource Limit (A) details are presented when you touch upon the Chart Bars.
This chart allows you to choose from the following options:
Projection Period:
* Weekly Period
* Monthly Period
Projected Value:
* Allocated Quantity
* Allocated Days (B)
* Allocated Time (B)
* Allocated Cost
Notes:
(A) The Threshold Line and the Resource Limit are presented for Work & Technology Resources only.
(B) These options are available for Work & Technology Resources only.
7.7 07/11/2024
Resource Projections Screen "New"
------------------------------------
This screen provides Resource & Task Level Projections for the Selected Resource.
* The Resource Level projections are presented in the top row.
* The Task Level Projections are presented in the subsequent rows.
This screen allows you to choose from the following options:
Projection Period:
* Weekly Period
* Monthly Period
Projected Value:
* Allocated Quantity
* Allocated Days (A)
* Allocated Time (A)
* Allocated Cost
Note:
(A) These options are available for Work & Technology Resources only.
Performance Improvements
----------------------------
Improved screen layout update & scrolling performance of the following screens:
* Project Planning & Tracking
* Task Predecessors
* Task Successors
* Project Gantt Chart
* Project Resources
* Resource Tasks
* Task Resources
7.6 06/13/2024
New Functionality
------------------
Added "Refresh" Button to the following screens:
* Project Planning & Tracking Screen
* Task Predecessors Screen
* Task Successors Screen
* Project Gantt Chart Screen
* Project Resources Screen
* Resource Tasks Screen
* Task Resources Screen
Note: This button allows you to request Full Screen Refresh, whenever you notice persistent empty areas in the screen, as you browse through the screen rows & columns.
Code Fixes
-----------
Fixed Screen Layout Processing issues identified in the following screens:
* Project Planning & Tracking Screen
* Task Predecessors Screen
* Task Successors Screen
* Project Gantt Chart Screen
* Project Resources Screen
* Resource Tasks Screen
* Task Resources Screen
Fixed Project Planning & Tracking Screen issue that caused the setting of Project Task records with incorrect Latest Start & Finish Dates for Tasks Without Dependencies.
7.5 04/28/2024
Project Gantt Chart Screen (New "Refresh" Button)
---------------------------------------------------
The "Refresh" button has been added to the screen header. This button allows you to request a Full Screen Refresh whenever you notice persistent empty areas in the screen, as you browse through your Project Gantt Charts.
NOTE: This button has been added as a temporary solution, in order to ensure full visibility of your Project Gantt Charts. We are currently investigating this issue, and will be implementing a permanent solution as soon as we identify the root cause.
"Show To Dos" User Notification Action (Code Fix)
--------------------------------------------------
Implemented code fix to ensure proper handling of the "Show To Dos" User Notification Action.
7.4 04/12/2024
Project Gantt Chart Screen (Version 7.3)
----------------------------------------
Code fixes and performance improvements have been implemented to ensure that up to date Project & Task Planning & Tracking Data are efficiently presented in the Gantt Chart Grid, and depicted in the Gantt Chart Bars.
Data Picker Popover Screens (Version 7.2)
--------------------------------------------
The Date Picker Popover Screen is presented whenever you touch upon any editable date field.
The Option Picker Popover Screen is presented whenever you touch upon any editable option field.
The new popover screens are now used by the following Application Screens:
* Project Planning & Tracking
* Task Predecessors
* Task Successors
* Project Resources
* Time Sheet Details
* To Do Details
* Daily Alerts Settings
Note: The new popover screens are available on both iPhone and iPad devices.
Project Export File (Version 7.2)
-----------------------------------
The Project Export File includes the following additional data:
* Project Records - New fields: Allocated Effort & Allocated Cost
* Task Records - New fields: Allocated Effort & Allocated Cost
* Project Resource Records "New"
* Resource Allocation Records "New"
7.3 03/28/2024
Data Picker Popover Screens (New Feature)
--------------------------------------------
The Date Picker Popover Screen is presented whenever you touch upon any editable date field.
The Option Picker Popover Screen is presented whenever you touch upon any editable option field.
These new popover screens have been installed in the following Application Screens:
* Project Planning & Tracking
* Task Predecessors
* Task Successors
* Project Resources
* Time Sheet Details
* To Do Details
* Daily Alerts Settings
Note: These new popover screens are available on both iPhone and iPad devices.
Project Export File (Enhancements)
-----------------------------------
The Project Export File includes the following additional data:
* Project Records - New fields: Allocated Effort & Allocated Cost
* Task Records - New fields: Allocated Effort & Allocated Cost
* Project Resource Records "New"
* Resource Allocation Records "New"
7.2 03/22/2024
What's New in Version 7.1
--------------------------
Project Gantt Chart Screen (Enhancements)
--------------------------------------------
Improved screen presentation & update time by calculating the Gantt Chart Visual Elements Properties in the background.
Improved user feedback by presenting the Activity Indicator while the background calculations are taking place.
---------------------- // ------------------------
What's New in Version 7.0
--------------------------
Project Resources Screen (New)
--------------------------------
This screen allows you to create, update, and delete Project Resources providing:
* Resource Identification Data
* Resource Category: Work, Material, Technology, Service, and Other Resources
* Week Days Available (A)
* Daily Hours Available (A)
* Available Quantity
* Resource Cost Details
This screen provides the following Resource Allocation Totals:
* Allocated Quantity
* Allocated Days (A)
* Allocated Time (A)
* Allocated Cost
(A) For Work & Technology Resources only
Task Resources Screen (New)
------------------------------
This screen allows you to allocate multiple Resources to one particular Task providing:
* Selected Resource
* Allocated Quantity
This screen provides the following Resource Allocation Totals:
* Allocated Days (A)
* Allocated Time (A)
* Allocated Cost
(A) For Work & Technology Resources only
Resource Tasks Screen (New)
------------------------------
This screen allows you to allocate one particular Resource to multiples Tasks providing:
* Selected Task
* Allocated Quantity
This screen provides the following Resource Allocation Totals:
* Allocated Days (A)
* Allocated Time (A)
* Allocated Cost
(A) For Work & Technology Resources only
Project Planning & Tracking Screen (Enhancements)
----------------------------------------------------
The following columns have been added to the Project Planning & Tracking Grid:
* Allocated Effort - This column shows the Project & Task Allocated Efforts
* Allocated Cost - This column shows the Project & Task Allocated Costs.
7.1 02/05/2024
Project Resources Screen (New)
--------------------------------
This screen allows you to create, update, and delete Project Resources providing:
* Resource Identification Data
* Resource Category: Work, Material, Technology, Service, and Other Resources
* Week Days Available (A)
* Daily Hours Available (A)
* Available Quantity
* Resource Cost Details
This screen provides the following Resource Allocation Totals:
* Allocated Quantity
* Allocated Days (A)
* Allocated Time (A)
* Allocated Cost
(A) For Work & Technology Resources only
Task Resources Screen (New)
------------------------------
This screen allows you to allocate multiple Resources to one particular Task providing:
* Selected Resource
* Allocated Quantity
This screen provides the following Resource Allocation Totals:
* Allocated Days (A)
* Allocated Time (A)
* Allocated Cost
(A) For Work & Technology Resources only
Resource Tasks Screen (New)
------------------------------
This screen allows you to allocate one particular Resource to multiples Tasks providing:
* Selected Task
* Allocated Quantity
This screen provides the following Resource Allocation Totals:
* Allocated Days (A)
* Allocated Time (A)
* Allocated Cost
(A) For Work & Technology Resources only
Project Planning & Tracking Screen (Enhancements)
----------------------------------------------------
The following columns have been added to the Project Planning & Tracking Grid:
* Allocated Effort - This column shows the Project & Task Allocated Efforts
* Allocated Cost - This column shows the Project & Task Allocated Costs.
Project Gantt Chart Screen (Enhancements)
--------------------------------------------
Improved Project Gantt Chart Cells drawing & presentation logic, in order to maximize chart redrawing performance, whenever the user changes the Zoom Level or switches between Effort & Cost Based Progress options.
7.0 01/25/2024
Planning Grid Configuration Screen (New)
------------------------------------------
This screen allows you to select which of the following Column Groups should be visible in the Project Planning & Tracking Screen:
* Date Based Planning Columns
* CPM Based Planning Columns
* Effort Based Planning Columns
* Cost Based Planning Columns
Note: This screen is listed in the Project Context Menu, which is presented when you long-press on the Project Name cell.
Cloud Kit Process (Code Fixes)
-------------------------------
* Fixed issue identified in the Task Dependency Records Upload process, which could cause the creation of duplicated records.
In-App Purchases Process (Code Fixes)
----------------------------------------
* Fixed issue identified in the In-App Purchases performed directly at the App Store, in order to ensure the correct local processing of the purchase transaction.
6.7 10/20/2023
Project Planning & Tracking Screen - Code Fixes
------------------------------------------------
a) Fixed planned & in-progress project's effort based projected progress calculation issue.
b) Fixed planned & in-progress task's effort based projected progress calculation issue.
Project Gantt Chart Screen - Code Fixes
----------------------------------------
a) Fixed planned & in-progress project's effort based planned & projected progress calculation issue.
b) Fixed planned & in-progress task's effort based planned & projected progress calculation issue.
c) Fixed planned & in-progress task's cost based planned progress calculation issue.
d) Fixed planned & in-progress project's & task's planning bar drawing issue.
6.6 10/13/2023
Project Gantt Chart Screen - Enhancements
--------------------------------------------
a) Improved In-Progress Project & Tasks Estimated Finish Date calculation by adding their respective Planned Duration to the Actual Start Date, according to the Planned Duration Unit.
b) Added functionality to highlight Critical Path Tasks by displaying their respective Task Planning Bars with Red Color Borders.
6.5 10/10/2023
What's New in Version 6.4
--------------------------
Project Planning Gantt Chart Screen changes:
----------------------------------------------
a) Fixed code that formats project tracking bar length when both project's progress date and project's estimated finish date fall into the same collection view cell.
b) Fixed code that formats task tracking bar length when both task's progress date and task's estimated finish date fall into the same collection view cell.
c) Fixed code that formats project planning & tracking bars when they include both progress time & remaining time sections.
d) Fixed code that formats task planning & tracking bars when they include both progress time & remaining time sections.
Smart Arrow Project Manager Tutorial changes:
-----------------------------------------------
a) Updated "Project Planning & Tracking Screen" section adding complete details about project & task planning & tracking grid columns.
b) Removed "Project Details Screen" & "Task Details Screen" sections because these screen have already been removed from the app.
What's New in Version 6.3
--------------------------
Project Gantt Chart Screen
---------------------------
This screen presents the Gantt Chart for the selected project, which includes the following visual elements:
a) Project Planning Bar depicting the Planned Start & Finish Dates, and the Projected Progress.
b) Project Tracking Bar depicting the Actual Start & Finish (*) Dates, and the Actual Progress.
c) Task Planning Bars depicting the Planned Start & Finish Dates, and the Projected Progress.
d) Task Tracking Bars depicting the Actual Start & Finish (*) Dates, and the Actual Progress.
(*) The Estimated Finish Date is used, instead of the Actual Finish Date, for In-Progress Projects & Tasks.
The following features are included:
a) Progress Option: You can select Effort or Cost Based Progress. This option determines the Projected & Actual Progress shown in the Planning & Tracking Bars.
b) Zoom Option: You can zoom-in & zoom-out across four zoom levels.
c) Todays Date Line: The todays date line is presented as a vertical dashed red line.
The Project/Task Actual Progress is presented in the following colors, in order to highlight the risk of not completing them on time:
a) Turquoise - Completed Project/Task.
b) Red - Late Project/Task.
c) Orange - In-Progress Project/Task with High Delay Risk.
d) Yellow - In-Progress Project/Task with Medium Delay Risk.
e) Green - In-Progress Project/Task with Low Delay Risk.
Removed Screens & Functions
-------------------------------
The following screens have been removed because their functionality is already provided by the "Project Planning & Tracking" screen.
a) "Project Details" screen
b) "Task Details" screen
The "Project Tasks" screen does not allow you to create new tasks anymore because this function is already provided by the "Project Planning & Tracking" screen.
6.4 09/29/2023
Project Gantt Chart Screen
---------------------------
This screen presents the Gantt Chart for the selected project, which includes the following visual elements:
a) Project Planning Bar depicting the Planned Start & Finish Dates, and the Projected Progress.
b) Project Tracking Bar depicting the Actual Start & Finish (*) Dates, and the Actual Progress.
c) Task Planning Bars depicting the Planned Start & Finish Dates, and the Projected Progress.
d) Task Tracking Bars depicting the Actual Start & Finish (*) Dates, and the Actual Progress.
(*) The Estimated Finish Date is used, instead of the Actual Finish Date, for In-Progress Projects & Tasks.
The following features are includes:
a) Progress Option: You can select Effort or Cost Based Progress. This option determines the Projected & Actual Progress shown in the Planning & Tracking Bars.
b) Zoom Option: You can zoom-in & zoom-out across four zoom levels.
c) Todays Date Line: The todays date line is presented as a vertical dashed red line.
The Project/Task Actual Progress is presented in the following colors, in order to highlight the risk of not completing them on time:
a) Turquoise - Completed Project/Task.
b) Red - Late Project/Task.
c) Orange - In-Progress Project/Task with High Delay Risk.
d) Yellow - In-Progress Project/Task with Medium Delay Risk.
e) Green - In-Progress Project/Task with Low Delay Risk.
Removed Screens & Functions
-------------------------------
The following screens have been removed because their functionality is already provided by the "Project Planning & Tracking" screen.
a) "Project Details" screen
b) "Task Details" screen
The "All Tasks" screen does not allow you to create new tasks anymore because this function is already provided by the "Project Planning & Tracking" screen.
6.3 09/15/2023
Version 6.2 includes the following code fixes:
Project Planning & Tracking Screen - Code Fixes
-------------------------------------------------
a) Updated Critical Path Method Forward Pass code in order to correctly calculate the Successor Tasks' Earliest Start & Finish Dates when the Dependency Record has been set with Negative Lag.
b) Updated Critical Path Method Backward Pass code in order to correctly calculate the Predecessor Tasks' Latest Start & Finish Dates when the Dependency Record has been set with Negative Lag.
Task Predecessors (Successors) Screen - Code Fixes
-----------------------------------------------------
a) Updated Predecessors (Successors) Dependency Lag data capture & validation code in order to correctly accept, validate, and record Negative Values
Version 6.1 includes the following new functionality:
Project Planning & Tracking Screen - Enhancements
----------------------------------------------------
This screen now features the CPM (Critical Path Method) Planning Process!
The Project Planning & Tracking screen grid now includes the following additional columns:
a) Predecessors - These cells show a summary about the Task Predecessors created.
b) Successors - These cells show a summary about the Task Successors created.
c) Earliest Start & Finish Dates - These dates are calculated based on the Predecessor Tasks Planning & Dependency Data.
d) Latest Start & Finish Dates - These dates are calculated based on the Successor Tasks Planning & Dependency Data.
e) Total Float - This is the maximum allowed delay beyond the Task Earliest Finish Date without impacting the Project Planned Finish Date.
f) Free Float - This is the maximum allowed delay beyond the Task Earliest Finish Date without impacting any of its Successors Tasks' Earliest Start Date.
g) Float Unit - This will be automatically set to either Days or Weekdays, depending on the Task Planned Duration Unit.
This screen uses the Task Planning & Dependency Data provided to execute the CPM Planning Process as described below:
a) All tasks without predecessors will have their earliest start & finish dates set to their respective planned start & finish dates.
b) All tasks with predecessors will have their earliest start & finish dates calculated & updated.
c) All tasks with predecessors will have their planned start & finish dates set to their respective earliest start & finish dates.
d) All tasks without successors will have their latest start & finish dates set to their respective earliest start & finish dates.
e) All tasks with successors will have their latest start & finish dates calculated & updated.
f) All tasks will have their total float & free float calculated & updated.
Task Predecessors (Successors) Screens - New
------------------------------------------------
These screens are presented when you touch upon any Task Predecessors (Successors) cell.
These screens list the Predecessors (Successors) for the selected task, and allow you to add, change, and remove Predecessors (Successors).
The Task Predecessors (Successors) screen grid includes the following columns:
a) Task Name - These cells allow you to select the Predecessor (Successor) Task.
b) Rule - These cells allow you to select the Dependency Rule. The choices are: FF (Finish to Finish), FS (Finish to Start), SF (Start to Finish), and SS (Start to Start)
c) Lag - These cells allow you to provide a Dependency Delay Time (i.e. Positive Lag) or a Dependency Overlay Time (i.e. Negative Lag).
d) Lag Unit - These cells allow you to set the Dependency Lag Unit. The choices are: Unit, Weekday, Week, and Month.
Note: Any Task Dependency added in the Task Predecessors (Successors) screen will automatically show up in the corresponding Task Successors (Predecessors) screen(s).
6.2 08/02/2023
Project Cost Projections Chart (Enhancements)
-----------------------------------------------
Added the "Cumulative" option, which allows you to visualize Project Cost Projections Charts with Cumulative Values.
This option is particularly helpful when you select the Area Chart or Bar Chart options, because they basically provide Multiple Stacked Project Cost S-Curves.
For example, when you choose the Category Level and Monthly Period options, you get Multiple Stacked Resource Category Level S-Curves showing Cumulative Monthly Values.
more Version 9.3 Mar 17
Data Not Collected The developer does not collect any data from this app.