U-ROCK
U-ROCK UES Ops Tool
Free
U-ROCK is a UES enterprise proof Ops Tool Platform will enables Field users to access a cloud-based suite of applications to share the services provided to customers
The U-ROCK mobile application will be used by field users to capture the test or inspection information from the field.
The application supports field data/sample collection for different methods of one or many service lines. No personal information is captured using the application. The data captured using the app will be as follows:
1. Test data or inspection data, the user will key in the information in the app data capture forms.
2. The user will capture the picture or video of the Concrete cylinder/grout/mortar
3. The user will capture the location (Lat & Lang) of the test being conducted, location of the concrete cylinder/ grout/mortar
more 1.Deviations - Enhancement/ Workflow.
2.Corpus Christi-Field: Auger Cast in Place Piles Observation - Log Sheet.
3.“View Proctors” Modal Showing Removed Proctor/LBR 0413 for Test 2845
4.Nuclear Density Observations & Recommendations not updating properly.
4.Project → Reports section shows "No Data" while web shows multiple submitted reports for the same project.
3.2.19 4d ago
Enhancements:
1.Feature: Project Document Access from Work Item.
2.Implement Pagination and Search Optimization for Specimens Check-Ins Tile.
3.Resorting Images attached to WIs.
4. Sand Cone Density New field and tool tip updates.
Bug fixes:
1.PROD: Asphalt Field Testing.
2.Folders not showing up in Project Documents on the Mobile App.
3. Update calculations dependent fields when entered from the bulk updated values.
4. Horizontal Diaphragm Inspection Report.
3.2.18 Jul 27
Enhancements:
1.Corpus Christi: Barrier Cable Form and Report.
2.Ultrasonic Welding Examination Form and Report.
3.Update Report to Include Data Grid for New "Welding Inspection" Form.
Bug fixes:
1.Multiple instances of the same work item on a single Work Order are mirroring data / overwriting each other.
2. Lock Las Vegas Reports Upon Technician Signature and Move to “Ready to Distribute” Fails on PDF Forms.
3.2.17 Jul 20
Enhancements:
1.Corrected Proctor Result mapping to View Proctors.
2.Field Density: Retest popup: Address.
3.Concrete Field Testing – Add “Pickup Cylinder Today” Dropdown (Client Cast = Yes)
4. Rammed Aggregate Pier Installation Report.
5. Floor Flatness Report.
6. Nuclear Gauge ASTM D6938 - Soils/Agg In-Place Density: Test Grid: New Column: Custom Test ID.
7. Orlando - Drive Cylinder ASTM D2937 - for Moisture Method selected as "Speedy" in Field test results.
3.2.16 Jul 13
Enhancements:
1.Configurable Time Entry (Mandatory)
2.Implemented Rebar Sampling Form ASTM A370.
3.Few forms are supported to offline accessablity.
Bug Fixes:
1. Asphalt Field Testing and Sampling
2. Work Item "Display Name" does not reflect on Field User.
3. Post Tension Stressing report calculations issue has been resolved.
3.2.15 Jul 6
Enhancements:
1.Bold report for Spray Applied Fireproofing Special Inspection
2.Florida - Configuration setting at Org Level for Pickups
3.Created PDF Report - Transmittal Letter
Bug Fixes:
1. Cloning WI:UROCK Mistakenly selecting multiple (same) WIs
2. Staff Professional Report
3. "Wall Information" Data Grid 'Add Record' Modal is Blank screen.
3.2.14 Jun 29
Enhancements
1. Support PDF Attachments in Reports
2. Las Vegas Field Users: Recall button
3. Populate Sample Location and Address in View Proctors when Sample is Saved.
3.2.13 Jun 22
Enhancements
1. Bold Reports for Spray Applied Fireproofing Daily
2. Display Out of Scope and Pickup Work Order Indicators.
3. WO Address in Mobile application Actionable.
4. Asphalt Field Testing and Sampling report.
5. Visual Icon for Work Items added by Field Technicians.
3.2.12 Jun 15
New Updates
1. Retaining Wall Waterproofing
2.Autogenerate Report Combined field
3.Fireproofing Density Sampling Sheet
4.Wedge and Screw Anchor Daily Report
5.Form Link Drop Down Not Text Searchable like WEB
6.Masonry Inspection Daily Report
7.Add Visual Flag/Icon/text for Work Items added by Field Technicians
8.Reinforcing Steel (Rebar) Observation Report
3.2.11 Jun 8
New updates
1.Post-Tension Stressing Report
2.Bold Report for Area Acceptance Report
3.Drilled Shaft Pile Inspection
4.Ultrasonic Weld Evaluation Report
5. CLV Post-Installed Adhesive Anchorage Clearance 2nd Report
6.CCBD Wood Inspection Startup Form
7.CCBD Welder Qualification Record (WQR) Verification
8.Bold Report for Fire-Stop Penetration/Fire-Resistive Joint/Perimeter Installer Verification Form
9.NCR-ROC - West Requirement
3.2.10 Jun 1
New Updates
1. Bold Report for Fire-Stop Penetration/Fire-Resistive Joint/Perimeter Area Acceptance.
2. Bold Report for CLV Post-Installed Mechanical Anchorage Clearance.
3. Bold Report for Exterior Insulation Finish System (EIFS).
4. Field Gradation: Sieve Analysis of Road-Mix Stabilized Materials form from grams to pounds.
3.2.9 May 26
New Updates
1. Bold Report for Fire-Stop Penetration/Fire-Resistive Joint/Perimeter Area Acceptance.
2. Bold Report for CLV Post-Installed Mechanical Anchorage Clearance.
3. Bold Report for Exterior Insulation Finish System (EIFS).
4. Field Gradation: Sieve Analysis of Road-Mix Stabilized Materials form from grams to pounds.
3.2.8 May 26
New Updates
1. Bold Report for CLV Post-Installed Adhesive Anchorage Clearance.
2. Bold Report for Wood Shear Walls Inspection.
3. Bold Report for Horizontal Diaphragm Inspection.
4. Bold Report For CCBD Post-Installed Mechanical Anchorage Clearance.
5. Bold Report for CLV Post-Installed Mechanical Anchorage Clearance
6. Permit Number Dropdown within Project Information Section.
3.2.7 May 18
New Updates
1. Welder Qualification Record (WQR) Verification report
2. Fire-Stop Penetration/Fire-Resistive Joint/Perimeter Daily Inspection report.
3. Bold Report for Wood Inspection Daily.
4. Helical Driven Piles.
5. Structural Steel Inspection Report (LV).
6. Field Gradation.
7. CCBD Post-Installed Adhesive Anchorage Clearance 2nd Report.
3.2.6 May 11
New Updates
1. HMAC Cored In Place Density
2. Drilled Belled Piers
3. Field: Drilled Piers Report
4. Drilled Straight Shaft Piers
3.2.5 May 4
New Updates
1. Verification of Welders, Procedures, Materials, And Equipment Report
2. Soils Inspection Daily Report
3. Implemented "Clone From" feature inside Work Items.
3.2.4 Apr 20
New Updates
1. Spray Applied Fireproofing Daily Report LV V2
2. High Strength Bolting Inspection
3. Reinforcing, Embeds, and/or Pre-Slab Report
4. Structural Welding Inspection – Joint
3.2.3 Apr 13
New Updates
1.River side bold reports.
2.Site address in the ReTest.
3.Concrete placement obseravation report
3.2.2 Apr 6
New Updates
1. Mild-Reinforcing Daily Report
2. Screw Anchor Installation Report
3. Saturation Field Report
4. High Strength Bolt Report
5. Concrete Relative Humidity Testing report
6. Anchor Bolt Proof Load Test
3.2.1 Mar 30
New reports update
Bug fixes and UI ehancements.
3.2.0 Mar 16
New Updates
1. Inspection Report
2. Concrete Placement Observation Report
3. Fireproofing Cohesion/Adhesion Test Report
4. Epoxy Inspection Daily Report
5. Special Inspection Daily Report
6. Assistance By Technician, Standby, Or Cancellation Report
3.1.0 Mar 9
New Updates
1. Nuclear Gauge Retaining Wall report
2. Anchor Inspection Report
3. Soil Sample Pick Up Intended Use Multi Select
4. Offline Support Forms.
3.0.15 Feb 23
1. New Drive Tube Retaining Wall form added
2. Concrete field testing improvements
3. Bug fixes
3.0.14 Feb 2
1. Set ordering in Concrete Field-Testing Parent
2. Unsubmitted Work Item Automatically Moves to Submitted Tile When Another WI Is Submitted.
3. Implemented Offline support for WI's.
4. Bug fixes.
3.0.13 Jan 27
1.Deviations - Enhancement/ Workflow.
2.Corpus Christi-Field: Auger Cast in Place Piles Observation - Log Sheet.
3.“View Proctors” Modal Showing Removed Proctor/LBR 0413 for Test 2845
4.Nuclear Density Observations & Recommendations not updating properly.
4.Project → Reports section shows "No Data" while web shows multiple submitted reports for the same project.
more Version 3.2.19 4d ago
Data Not Collected The developer does not collect any data from this app.