sCS commissioning 4+

Tridonic

    • 무료

스크린샷

설명

The sceneCOM S commissioning app has been specially developed to help make commissioning the sceneCOM S lighting control system intuitive. The DALI-2-based, scalable lighting control system which is covers variety of applications: from complex stand-alone luminaire setups to small to medium building areas encompasses a wide range of functions – from simple switching on and off and dimming/brightening to daylight linking – even with Tunable White lighting – and individual lighting scenarios.
Each system supports up to 64 DALI 1 or DALI 2-based LED drivers and 16 input devices such as sensors or momentary-action switches. A single DALI LED driver or control device can therefore belong to several groups and thus various scenes.  

Individual luminaire setups can be as well quiet complex and consist of up to 4 independent light heads with multiple drivers, groups and control devices like sensors and push button interfaces. Lighting manufacturers are able to create various luminaire setups using new Free-standing luminaire (FSL) configurator.  

With the latest release sCS Comissioning APP is able to bring advantages of dynamic time-based lighting to our customers as new sceneCOM S RTC hardware support highly accurate real time clock. Now it is possible to assign different Human Centric Lighting profiles to one or multiple groups with Tunable White luminaries.
The app is so intuitive to use, commissioning can be completed in just four simple steps. A particularly practical feature is Bluetooth, which enables unlimited use of the app even in offline mode.

Step 1: Create
In the first step, the new project is created. The basis for this can be either a new floor plan or a cloned layout. Luminaires are grouped and planned with corresponding light scenes.

Step 2: Connect and identify
Once the sceneCOM S commissioning app is connected to the sceneCOM S application controller, the system components (e.g. LED drivers, sensors or switches) in the app are automatically addressed. Easy device identification with the single touch of the device icon or single press of the switch push button.

Step 3: Plan
Using drag and drop, system components such as luminaires, sensors and momentary-action switches can now be placed in the floor plan and assigned to the various groups.

Step 4: Configure
The desired functions can then be defined and assigned. Finally, the project can be PIN-protected.
Completed projects and templates can be shared or copied and pasted to other projects. An over-the-air update ensures that the software is always up to date.

새로운 기능

버전 2.1.0

Custom background images can now be used for the floor plan view.
You can now take a photo or load images from your Gallery, use them as background for your plan, and store them as template for future projects.

앱이 수집하는 개인정보

Tridonic 개발자가 아래 설명된 데이터 처리 방식이 앱의 개인정보 처리방침에 포함되어 있을 수 있다고 표시했습니다. 자세한 내용은 개발자의 개인정보 처리방침을 참조하십시오.

사용자에게 연결되지 않은 데이터

다음 데이터가 수집될 수 있지만 신원에는 연결되지 않습니다.

  • 사용 데이터
  • 진단

개인정보 처리방침은 사용하는 기능이나 사용자의 나이 등에 따라 달라질 수 있습니다. 더 알아보기

이 개발자의 앱 더 보기

4remote BT
생산성
connecDIMLite
유틸리티
4service NFC
생산성
sCS Remote
유틸리티
connecDIM Architect
유틸리티
Events Tridonic
비즈니스

좋아할 만한 다른 항목

DIMLITE pro commissioning
유틸리티
DIMLITE pro G2 Remote
유틸리티
PROset App
유틸리티
DALI Cockpit Mobile
유틸리티
Tuner4TRONIC Field
유틸리티
Zumtobel nBox
유틸리티