Construction Change Order App 4+
Snappii
Designad för iPad
-
- Gratis
- Erbjuder Köp inuti app
Skärmavbilder
Beskrivning
14-day free trial.
Construction Change Order App was specifically designed for employees working in the construction industry to create quick construction change order requests and provide them to selected supervisors for reviews. The app allows users to instantly fill in specific details including information about labor, equipment, parts, construction sites, date and timestamps, upload PDF documents, take pictures, perform specific calculations etc. The app can be 100% customized by Snappii.
With the help of the Construction Change Order App workers can create change orders on the spots, make a list of supervisors, assign orders to them, track supervisor's feedback and proposed changes in case of rejections. Employees can easily track if their order was accepted or denied and re-make orders on demand. Due to the in-built calculator it is simple to estimate total hours and costs needed to complete a particular project. That definitely saves time and expenses as well as improves accuracy and eliminates paperwork.
Any order will be securely stored on user's device and can be emailed, uploaded to cloud drives or printed out as a PDF form. Moreover, users can upload their own fillable PDF forms to collect specific information as an additional option. The uploaded files will be saved into the library of templates that can be re-used multiple times and shared.
Construction Change Order App will enable users to:
- make construction changes orders on the go
- work offline and online
- save collected orders on a device
- sync completed orders across multiple devices
- track order statuses
- remake orders on demand
- make specific calculations
- share PDF files
- add supervisors
- make reviews and comment on them
- upload custom PDF forms
- custom search by orders
By downloading, you agree to the Terms of Use at https://www.snappii.com/terms-of-service and privacy policy at https://www.snappii.com/policy
After the free trial, you can get unlimited number of form submissions by subscribing via an optional In-App Purchase. Subscribe from your device and access these services via mobile app.
Nyheter
Version 1.0.20
In this version, we have fixed the image ratio. Images now fit the cell and are clickable right from your PDF report so you could enlarge them.
Send your feedback to support@snappii.com
Appintegritet
Utvecklaren Snappii har angett att appens integritetsrutiner kan inkludera hantering av data enligt beskrivningen nedan. Det finns mer information i utvecklarens integritetspolicy.
Data som inte kopplas till dig
Följande data kan samlas in men den kopplas inte till din identitet:
- Kontaktinformation
Sekretessriktlinjer kan variera, till exempel utifrån de funktioner du använder eller din ålder. Läs mer
Information
- Leverantör
-
Snappii Corporation har identifierat sig som appens näringsidkare och har bekräftat att produkten eller tjänsten överensstämmer med gällande EU-lagar.
- D-U-N-S-nummer
- 078694552
- Adress
- 380 Lafayette rd Unit 11-301 Seabrook New Hampshire 038743 USA
- Telefonnummer
- +1 6035020191
- E-post
- bev@snappii.com
- Storlek
- 46,1 MB
- Kategori
- Näringsliv
- Kompatibilitet
-
- iPhone
- Kräver iOS 11.0 eller senare.
- iPad
- Kräver iPadOS 11.0 eller senare.
- iPod touch
- Kräver iOS 11.0 eller senare.
- Mac
- Kräver macOS 11.0 eller senare och en Mac med Apple M1‑chip eller senare.
- Apple Vision
- Kräver visionOS 1.0 eller senare.
- Språk
-
engelska
- Ålder
- 4+
- Copyright
- © 2023 Snappii
- Pris
- Gratis
- Köp inuti app
-
- Annual Subscription 1 495,00 kr
- Monthly Subscription 155,00 kr
- Ad removal 9,00 kr