EDGE On Site extends the power of The EDGE Estimating Software into the field giving users the power to monitor production progress in real-time.
EDGE On Site connects to The EDGE estimate, blueprints and change orders on an iPad. With no double entry, field personnel track the production progress by selecting “shapes” on the original estimate or change order blueprint when work is completed. Teams see the exact point when production will exceed the original budget, and when the job is complete analyze job performance or use the job results to see exactly where you have made or lost money so future estimates are more precise.
Designed for construction projects that take more than 30 days, EDGE On Site is a mobile iPad app for roofing, framing, insulation, drywall and finish subcontractors or general contractors who self-perform work. EDGE On Site is used with The EDGE Estimating Software.
EDGE on Site is now available on the iPhone! Users can view the overview of a project, the associated drawings and have access to the most recent information without having to log into The EDGE Amin Portal or the iPad.
more The following items have been fixed:
• Company Wide tasks completed on iPad were not updating correctly in the EOS Portal.
• Project tasks completed on iPad were not updating correctly in the EOS Portal (including
completion status and comments).
• Title-based tasks completed on iPad were not updating correctly in the EOS Portal
(including completion status and comments).
• Completed tasks were not saving when the task modal was dismissed
1.6.8 Apr 16
• Uploaded files could not be opened.
• The Daily Roll-Up Report was not functioning.
• Shapes and color-coded legends were not displaying correctly.
• Reduced production was not saving correctly when adjusted using the crosshairs tool.
• Deduct shapes from change orders did not appear until the project was reloaded.
• Linked conditions did not retain the % Complete when adjusted using crosshairs tool.
• PDF and image file icons were obscured by black overlays.
• Photos without comments were not saving.
1.6.7 Jan 22
• Crosshairs randomly failed to update the percentage
• Shape coloration did not function correctly
• System crashes occurred when creating a purchase request
• Photos added without comments failed to save
1.6.6 08/20/2025
• System crashes occurring in V1.6.4.
• Updated SDK version (iOS 18 SDK).
1.6.5 05/19/2025
The following item has been fixed:
• System crashes occurring in V1.6.3
1.6.4 09/11/2024
The following items have been updated:
• System crashes occurring in V1.6.2
1.6.3 06/25/2024
-Improved performance and fixed crashing while loading Daily Production screen and uploading production.
- Fixed crash when updating projects with new change order data via the update prompt.
- Newly designed Daily Production screen. Improved performance when updating projects with changes from another user via the update
prompt.
- New and clarified verbiage within the automatic update prompts to help identify if changes
stem from change order or another user.
- New and clarified verbiage for the alert received when unloading a project with production that
has not been uploaded.
1.6.2 06/11/2024
We release updates regularly, and we’re always looking for ways to make things better. If you have any
feedback or run into issues, submit requests through the feedback form on the Estimating Edge website.
Performance Improvements: You should now see performance improvements when:
o Loading the daily production screen
o Uploading daily production from the daily production screen
1.6.1 04/10/2023
New Icons on Reporting Tab: You will now see some new and modernized icons to represent
the different reports available on the reports tab.
Column Label Adjusted for Code and Item Reports: For the code and item reports, the following
changes were made:
- column label “Remaining (Hrs)” was changed to “Forecast Total Hrs” and
- column label “Target (Hr)” was changed to “Target (Unit/Hr)”
Performance Improvements: You should now see performance improvements when:
- loading project pages with a large number of takeoff shapes
- loading and submitting daily production from the daily production screen with a large
number of transactions
Fixed Crash When Loading Pages in Portrait Mode: A crash that occurred when loading project
pages in portrait view has now been resolved.
1.6 02/08/2023
Bug Fixes - Performance Improvements
When tapping on a code or condition to make takeoff shapes appear, you will
now see a loading indicator pop up that will remain on the screen until the
shapes are completely finished generating.
- This will ensure that no background processes are in place while the user is
maneuvering through the application, which will in turn effect overall
performance.
- Aside from the loading indicator, overall general performance increases should
be noticeable when loading shapes on a page.
1.5.1 08/19/2021
- Improved Settings Options- Edge on Site now allows you to improve the individuals interface with more user defined settings that control Crosshair size and Line Thickness.
- Fireproofing Trade includes the setting to default the production screen to the Conditions tab or Codes tab. Conditions view is the preferred view for the Fireproofing trade.
- Additional Bug Fixes
1.5 04/01/2021
Multi-code Production
EDGE On Site™ is introducing a new, more efficient way to track production. This feature gives users the ability to select multiple codes and define the completion percentage all at once.
EDGE On Time Integration:
EDGE On Site released its own time card solution, EDGE On Time. Users clock in and clock out using the new application EDGE On Time and EDGE On Site receives the time submitted; making sure all of the hours are recorded and displayed on the Overview Screen and throughout the project.
When an employee clocks in with EDGE On Time, it's assigned to a cost code in EDGE On Site. The inputted hours will be moved from estimated to remaining, allowing the foreman to better utilize their employees.
Additional Bug Fixes
1.4 11/27/2020
Performance Improvements-EDGE On Site has improved load time by allowing users to load only what they need, when they need it.
Offline Mode
Allows users to work on the project offline by download all project data. Click the “Offline Mode” button on the pages tab.
(Note: Submitting production and viewing codes at the overview screen still require internet connectivity.)
Estimated Hours
Selected shapes now have estimated hours.The shapes are totaled at the bottom of the dialog box, aggregated by labor item.
Hours Input
Removed the hour input setting due to the confusion when selecting shapes.
Bug Fixes-minor reported bug fixeshave been made.
1.3.2 05/28/2020
Apple® iPad®:
Purchase Requests – EDGE On Site can generate a purchase request! Users can select from the material list and add quantity, requesting for field consumption to be approved and allocated from accounting. A PDF file will generate and store in the project's document control system. Each line is editable to allow for adjustments and price changes.
Modified Document Control System – Users can view the project at-a-glance, similar to the view from the Admin Portal.
Photos – Every photo taken on the iPad will be available within EDGE On Site. Each picture taken within EDGE On Site will now available in the iPad library.
Forced Update – Notification of Releases – To ensure compatibility and functionality consistency, all users will receive a notification to update to the latest release.
Apple® iPhone®:
Purchase Requests – Users can generate a purchase request for projects using a custom interface designed for the iPhone. Users can select from the material list and add quantity, requesting for field consumption to be approved and allocated from accounting. A PDF file will generate and store in the project's document control system.
Landscape Option – Landscape orientation for pages is available for larger viewing.
Zoom on Pages – Users can zoom on available blueprints.
iPad Equivalency – Task List, Files, Photos, and Materials are all now available!
1.3.1 03/12/2020
Apple® iPad®:
Purchase Requests – EDGE On Site can generate a purchase request! Users can select from the material list and add quantity, requesting for field consumption to be approved and allocated from accounting. A PDF file will generate and store in the project's document control system. Each line is editable to allow for adjustments and price changes.
Modified Document Control System – Users can view the project at-a-glance, similar to the view from the Admin Portal.
Photos – Every photo taken on the iPad will be available within EDGE On Site. Each picture taken within EDGE On Site will now available in the iPad library.
Forced Update – Notification of Releases – To ensure compatibility and functionality consistency, all users will receive a notification to update to the latest release.
Apple® iPhone®:
Purchase Requests – Users can generate a purchase request for projects using a custom interface designed for the iPhone. Users can select from the material list and add quantity, requesting for field consumption to be approved and allocated from accounting. A PDF file will generate and store in the project's document control system.
Landscape Option – Landscape orientation for pages is available for larger viewing.
Zoom on Pages – Users can zoom on available blueprints.
iPad Equivalency – Task List, Files, Photos, and Materials are all now available!
1.3 01/29/2020
New Interface (Apple® iPad®)
– New interface contains a simplified tab style allowing users to access all commonly used areas of the application with a single click.
- Production Only Option (Apple iPad) – Removes the need for mobile users to enter hours while submitting production.
- Material Tracking – EDGE On Site now tracks the percentage of material used per condition! Users can also view the total material per project and manually track total usage for a more accurate material representation.
- Full-Screen Mode (Apple iPad) – Allows users to fully expand the drawing blueprint area to utilize more of the Apple iPad screen.
Enhancements
- Code Breakdowns – On the Overview screen, users now see the total quantity value for each unit of measure contained inside of the code. On the Pages screen, press and hold on the Section or Page title displays a breakdown similar to the Overview screen. This feature increases the user’s overall understanding of the project’s completion
- Enter Quantity – Added the ability to directly enter total completed quantity at the labor item level within the production dialog box (when quantity setting is selected on the user’s Apple iPad).
- Selection Auto Lock – Lock is no longer needed. Dragging a single finger on the drawing screen allows users to select by locking the screen. Pan around the drawing using two fingers.
1.2.2 11/07/2019
New Interface (Apple® iPad®)
– New interface contains a simplified tab style allowing users to access all commonly used areas of the application with a single click.
- Production Only Option (Apple iPad) – Removes the need for mobile users to enter hours while submitting production.
- Material Tracking – EDGE On Site now tracks the percentage of material used per condition! Users can also view the total material per project and manually track total usage for a more accurate material representation.
- Full-Screen Mode (Apple iPad) – Allows users to fully expand the drawing blueprint area to utilize more of the Apple iPad screen.
Enhancements
- Code Breakdowns – On the Overview screen, users now see the total quantity value for each unit of measure contained inside of the code. On the Pages screen, press and hold on the Section or Page title displays a breakdown similar to the Overview screen. This feature increases the user’s overall understanding of the project’s completion
- Enter Quantity – Added the ability to directly enter total completed quantity at the labor item level within the production dialog box (when quantity setting is selected on the user’s Apple iPad).
- Selection Auto Lock – Lock is no longer needed. Dragging a single finger on the drawing screen allows users to select by locking the screen. Pan around the drawing using two fingers.
1.2.1 11/05/2019
New Interface (Apple® iPad®)
– New interface contains a simplified tab style allowing users to access all commonly used areas of the application with a single click.
- Production Only Option (Apple iPad) – Removes the need for mobile users to enter hours while submitting production.
- Material Tracking – EDGE On Site now tracks the percentage of material used per condition! Users can also view the total material per project and manually track total usage for a more accurate material representation.
- Full-Screen Mode (Apple iPad) – Allows users to fully expand the drawing blueprint area to utilize more of the Apple iPad screen.
Enhancements
- Code Breakdowns – On the Overview screen, users now see the total quantity value for each unit of measure contained inside of the code. On the Pages screen, press and hold on the Section or Page title displays a breakdown similar to the Overview screen. This feature increases the user’s overall understanding of the project’s completion
- Enter Quantity – Added the ability to directly enter total completed quantity at the labor item level within the production dialog box (when quantity setting is selected on the user’s Apple iPad).
- Selection Auto Lock – Lock is no longer needed. Dragging a single finger on the drawing screen allows users to select by locking the screen. Pan around the drawing using two fingers.
1.2 10/30/2019
EDGE on Site is now available on the iPhone! Users can view the overview of a project, the associated drawings and have access to the most recent information without having to log into The EDGE Amin Portal or the iPad.
The iPhone App is designed for review purposes only where the Apple® iPad® App is designed for field personnel to make changes.
New Features
Task List – Allows users to create a list of tasks from The EDGE™ Admin Portal. The list appears on the iPad for field personnel to complete. Tasks may be created for the company, project, or role and can be setup in intervals – day, week or month.
Daily Roll-Up Report – Consolidates all completed activities into a single daily report.
Tutorial – New user? Need a refresher? This tutorial provides an overview on how to use.
Document Control System –Field teams now view documents on an iPad once loaded on the administration portal.
Measurement Tool (iPad only) – Field teams can now measure the blueprint on the iPad when they need measurements not included in the original estimate. To measure by Linear foot use two points and for square foot use three or more points.
Enhancements
Total Hours on Daily Production Screen – Field users can now see the total current labor hours in the daily production view before upload.
User Code Export – Added the ability to view and export the user code field on the labor screen.
Bug Fixes
Corrected Login issue for some users
Crossing Area Shapes – Projects created in previous versions had issues displaying area shapes on the blueprints, shapes were misaligned.
1.0.9 08/30/2019
EDGE on Site is now available on the iPhone! Users can view the overview of a project, the associated drawings and have access to the most recent information without having to log into The EDGE Amin Portal or the iPad.
The iPhone App is designed for review purposes only where the Apple® iPad® App is designed for field personnel to make changes.
New Features
Task List – Allows users to create a list of tasks from The EDGE™ Admin Portal. The list appears on the iPad for field personnel to complete. Tasks may be created for the company, project, or role and can be setup in intervals – day, week or month.
Daily Roll-Up Report – Consolidates all completed activities into a single daily report.
Tutorial – New user? Need a refresher? This tutorial provides an overview on how to use.
Document Control System –Field teams now view documents on an iPad once loaded on the administration portal.
Measurement Tool (iPad only) – Field teams can now measure the blueprint on the iPad when they need measurements not included in the original estimate. To measure by Linear foot use two points and for square foot use three or more points.
Enhancements
Total Hours on Daily Production Screen – Field users can now see the total current labor hours in the daily production view before upload.
User Code Export – Added the ability to view and export the user code field on the labor screen.
Bug Fixes
Crossing Area Shapes – Projects created in previous versions had issues displaying area shapes on the blueprints, shapes were misaligned.
1.0.8 08/28/2019
EDGE on Site is now available on the iPhone! Users can view the overview of a project, the associated drawings and have access to the most recent information without having to log into The EDGE Amin Portal or the iPad.
The iPhone App is designed for review purposes only where the Apple® iPad® App is designed for field personnel to make changes.
New Features
Task List – Allows users to create a list of tasks from The EDGE™ Admin Portal. The list appears on the iPad for field personnel to complete. Tasks may be created for the company, project, or role and can be setup in intervals – day, week or month.
Daily Roll-Up Report – Consolidates all completed activities into a single daily report.
Tutorial – New user? Need a refresher? This tutorial provides an overview on how to use.
Document Control System –Field teams now view documents on an iPad once loaded on the administration portal.
Measurement Tool (iPad only) – Field teams can now measure the blueprint on the iPad when they need measurements not included in the original estimate. To measure by Linear foot use two points and for square foot use three or more points.
Enhancements
Total Hours on Daily Production Screen – Field users can now see the total current labor hours in the daily production view before upload.
User Code Export – Added the ability to view and export the user code field on the labor screen.
Bug Fixes
Crossing Area Shapes – Projects created in previous versions had issues displaying area shapes on the blueprints, shapes were misaligned.
1.0.7 08/01/2019
- Measure Tool
- Document Management System
- Added Tutorial
- Bug fixs
1.0.6 07/12/2019
- Measure Tool
- Document Management System
- Added Tutorial
- Bug Fixes
1.0.5 07/04/2019
- Bug fixes and improvements
1.0.4 04/26/2019
- bug fixes
1.0.3 04/03/2019
The following items have been fixed:
• Company Wide tasks completed on iPad were not updating correctly in the EOS Portal.
• Project tasks completed on iPad were not updating correctly in the EOS Portal (including
completion status and comments).
• Title-based tasks completed on iPad were not updating correctly in the EOS Portal
(including completion status and comments).
• Completed tasks were not saving when the task modal was dismissed
more Version 1.6.8 Apr 16
Data Not Linked to You The following data may be collected but it is not linked to your identity: