新绿

Utilities

Free · Designed for iPad

工程施工进度管理是施工单位要按照工期要求必须编制的施工进度计划,并且要以此为管理目标,进行全程的监督与检查。在此过程中,企业需要随时监督、协调、优化整个实施工程中的偏差,及时采取有效措施,保证工期目标的实现。企业应该充分利用本身的资源,在总目标的规划管理下,确保施工进度按部就班的进行,并且实现预期任务,达成施工目标。

  • This app hasn’t received enough ratings or reviews to display an overview.

解决部分已知问题

The developer, 太原市华森伟业科技发展有限公司, indicated that the app’s privacy practices may include handling of data as described below. For more information, see the developer’s privacy policy .

  • Data Not Collected

    The developer does not collect any data from this app.

    Privacy practices may vary, for example, based on the features you use or your age. Learn More

    The developer has not yet indicated which accessibility features this app supports. Learn More

    • Seller
      • Taiyuan Huasen weiye Science &Technology Development Co., Ltd.
    • Size
      • 88 MB
    • Category
      • Utilities
    • Compatibility
      Requires iOS 11.0 or later.
      • iPhone
        Requires iOS 11.0 or later.
      • iPad
        Requires iPadOS 11.0 or later.
      • iPod touch
        Requires iOS 11.0 or later.
      • Mac
        Requires macOS 11.0 or later and a Mac with Apple M1 chip or later.
      • Apple Vision
        Requires visionOS 1.0 or later.
    • Languages
      • English
    • Age Rating
      4+
    • Copyright
      • 太原市华森伟业科技发展有限公司 版权所有©2022